Field station renewal

Alder Works · Facilities Operations · Q-2048. Draft pricing. Issued 20 November 2026. Valid through 20 December 2026.

Order summary

USD 10,670.00 one time and 120.00 monthly. The optional 450.00 inspection requires separate approval.

Scope of work

Atlas station · At each receiving bay, capture the equipment reading before dispatch.

Harbor reserve · Keep one station online while the site supply is being serviced.

Delivery checkpoints
WhenOwnerPhaseAcceptance check
Week 1Facilities leadSite surveySite access, power and mounting positions confirmed.
Weeks 2–3Field engineeringInstallationEach station commissioned against the equipment list.
Week 4Operations sponsorAcceptanceTraining and handoff checklist acknowledged.

Configured pricing

Atlas station

Included components in USD
Component and SKUQtyList eachDiscountNet
Field station with sealed enclosure · AT-21023,125.0012%5,500.00
Mount and cable harness · AT-041295.000%190.00
Commissioning and operator training · SV-1061850.000%850.00

Bundle subtotal 6,540.00 USD. Monthly support 60.00 USD.

Harbor reserve

Included components in USD
Component and SKUQtyList eachDiscountNet
Power cabinet with changeover relay · HB-31013,750.008%3,450.00
Reserve battery module · HB-0142340.000%680.00

Bundle subtotal 4,130.00 USD. Monthly support 60.00 USD.

Optional service · Annual on-site readiness inspection · 450.00 USD.

Commercial terms

One-time payment schedule in USD
MilestoneShareAmount
At order30%3,201.00
After commissioning40%4,268.00
On acceptance30%3,201.00

Reference Q-2048 when approving this proposal through 20 December 2026. Confirm work-area access with the service coordinator before scheduling installation.